Our New Construction Process
Clear communication and consistent workmanship at every phaseโso your schedule stays on track.
01
Plan Review
We review drawings, fixture selections, and timelines, then confirm scope and inspection requirements.
02
Rough-In
Install DWV and water distribution, label lines, and keep runs accessible for other trades.

03
Test & Inspect
Pressure tests and walkthroughs before inspections to catch issues early and avoid delays.
04
Trim-Out & Turnover
Set fixtures, verify performance, and leave the space clean with a punch-list friendly finish.
What we do
Plumbing for New Builds
From underground to trim-out, Legacy Plumbing, Inc. coordinates with builders and trades to keep your project moving and your inspections smooth.
Underground & Rough-In
Water and drain lines, venting, and stub-outs installed per plan with clean routing and proper support.
Top-Out & Pressure Testing
Supply lines completed and tested, with documentation and quick corrections if an inspector requests changes.
Finish Trim & Fixture Set
Set toilets, faucets, tubs/showers, disposals, and final connectionsโclean, sealed, and ready for turnover.
Gas Piping (Where Applicable)
Gas line sizing and installation for ranges, fireplaces, and outdoor kitchens, with required testing and safety checks.
Why Legacy
Built for Inspections
